PROJECTS

scope
We are fabricating the heavy structural items of Boiler, conveyor & Pollution control equipments. The items mainly covers the following:
- Column for Boiler, ESP & Conveyor
- Hopper, Chute & Bunker
- Gallery, Ladder Arrangement
- Casting
- Flues & Ducts
- PF Mill Equipments for Boiler
- Girder
- IBR Jobs

Reference
Purchase order and Drawings recommended by our clients are the main reference of the job, but we also are detailing the drawings from G.A (General Assembly) drawings from our own design facilities. The whole job depends upon the P.O & other documents. But beside this, we first make the Quality Assurance Plant that has to be approved by our clients before the execution of job & if any requirement comes from the customer’s side shall be supersede the requirement specified herein.
To bring more perfection in our work we have introduced the Third party Inspection Agencies.
To bring more perfection in our work we have introduced the Third party Inspection Agencies.

Raw Material Verification
Raw materials should be free from visual defects like Cracks, Seams, Laps, Pitting defective rolling mark or other imperfections & laminations. Generally we purchase Raw Materials from specific dealers of SAIL and as well as direct from the SAIL Stockyard. These dealers are bound to give the batch TC to incorporate the heat number of the above material. In case the material suppliers are unable to produce the Material Test Certificate and the material bear jthe Maker’s identification, such materials are accepted through random check & the samples are to be client’s approved laboratory.

In Process Inspection
- Checking of Drawings
- Layout of Drawings
- Cutting of Materials as Layout dimentions
- Fitting the Materials & Dimentionally cleared for welding
- If required trial assembly to be done as per requirements
- Final inspection to be done by our QC people and then to be offered to the Client Internal Inspection Report to be done on the basis of the points
Project 1
Gas Conditioning Tower for BALCO, A/C ALSTROM Projects India Ltd.
Project 4
Cyclone Separator for JP Siddhi Project (A/c- ALSTOM)
Project 2
Hopper Assembly for Export-ELEX-Brasil
Project 5
Cyclone A/c - Meghalaya Power
Project 3
Boiler Column for IJT
Project 6
KINYERZI Project, Toshiba (A/c - Paharpur)